Construction Projects In Checklist

Ontario

In Force

Description

This Regulation applies to all construction projects in O…

Topics

Waste Management
Hazardous Materials Management
Safety Management
General Facility Design and Operation
Emergency Preparedness and Response
Occupational Health
Security and Public Safety
Environment Management
Equipment
  • Waste
  • Drainage
  • Conveyance
  • Timber
  • Dust
  • Radio
  • Pedestrian
  • Ramp
  • Barrier
  • Automobiles
  • Drum
  • Dry
  • Cap
  • Drill
  • Shaft
  • Electrode
  • Forklift trucks
  • Barricade
  • Blast
  • Cage
  • Chute
  • Compressed Air
  • Crane
  • Detonator
  • Dump
  • Egress
  • Fire suppression
  • Fresh air
  • Ground support
  • Headframe
  • Hoist
  • Hoist rope
  • Manway
  • Misfire
  • Ventilation
  • Helicopters
  • Sheave
  • Flashlights
  • Backhoes
  • Power
  • Regulator
  • Smoke
  • Exit
  • Back
  • Pass
  • Raise
  • Face
  • Loading
  • Communication
  • Skip

History of Changes

Published
1 Jan, 1991

Actions: Document Update

If the text of recent updates is in a language other than the one that you have selected, no text is available in your language of choice; if the text is not in English and you would prefer to see the text in English, you can do so by setting the NimonikApp language settings to English.

PART I
GENERAL
Interpretation and Application
1. (1) In this Regulation,

“adequate”, in relation to a procedure, plan, material, device, object or thing, means,

(a) sufficient for both its intended and its actual use, and

(b) sufficient to protect a worker from occupational illness or occupational injury,

and “adequately” has a corresponding meaning; (“adéquat”, “adéquatement”)

“allowable unit stress”, in relation to a material, means,

(a) the allowable unit stress assigned to a materi...

Access of over 200,000 regulatory documents, standards and other obligations. Track changes with a free 20 day trial account : Create an account today.